(416) 562-2555 info@sulyrenovation.ca Serving Toronto & the GTA — Free, no-obligation estimates

Renovations in the Former City of York, From Weston to Baby Point

Kitchens, bathrooms, basements and storefronts in Weston, Mount Dennis, Silverthorn, Fairbank and Oakwood Village, planned around low ceilings, creek flooding and two heritage districts.

York here means the former City of York inside Toronto, northwest of the old city and east of the Humber, not York Region north of Steeles. Much of its housing went up between the 1910s and the 1950s: modest brick detached houses and semis, many of them for families who worked at Kodak, the stockyards and the factories nearby. We renovate these homes knowing that low basements, storm water and decades of owner repairs usually shape the plan more than the floor area does.

Workers' houses built before the sewers arrived

York Township once reached north to Steeles Avenue. Its rural north broke away as North York in 1922 and its east side became East York in 1924; what remained merged with the Town of Weston in 1967, became a city in 1983 and was folded into Toronto in 1998. Its housing tells a working-class story. Mount Dennis grew around the Kodak plant that went up at Eglinton Avenue and Weston Road from 1913, and many people employed there, at the stockyards or at CCM, built their own houses before water mains reached their streets, the kind of place urban geographer Richard Harris called an unplanned suburb.

Silverthorn Heights went on sale in 1914 and sold quickly, yet its owners waited until the late 1920s for sewers and paved roads. Fairbank, on hilly streets west of Dufferin, was mostly laid out between the wars with small two-storey and storey-and-a-half detached houses. Rockcliffe-Smythe came later, built up after the Second World War around Conn Smythe's worked-out gravel pit, now Smythe Park, with homes offered to returning servicemen.

On site, that history means we assume very little and look at the structure from the basement and through the attic hatch before pricing anything. When a wall is coming out, an engineer sizes the beam, Toronto Building issues the permit and our framing crew builds to the stamped drawings.

Storm water, creeks and the Humber

Water has shaped this part of the city more than once. In October 1954, Hurricane Hazel pushed the Humber over its banks and washed away part of Raymore Drive in Weston; the losses led to stricter floodplain rules and turned low land along the river into parkland. On July 8, 2013, the heaviest rain of a storm that flooded basements all over Toronto fell on the west side of the city, close to 140 mm in a few hours. In Rockcliffe-Smythe, Black Creek and Lavender Creek put 366 properties inside the regulatory floodplain, and City reports call it the most flood-vulnerable area in the jurisdiction of TRCA, the regional conservation authority. The City's flood works there start with a new Jane Street bridge over Black Creek and continue in phases into the 2030s.

So before a basement gets finished here, we start outside: downspouts should already be disconnected from the sewer, soil should fall away from the walls and window wells need somewhere to drain. Inside, the backwater valve is a licensed plumber's job under a permit, inspected before anything covers it, with a sump pump where the plumber recommends one. Toronto's flood-protection subsidy pays part of the plumber's bill when its conditions are met, so read them before work starts.

Two heritage districts with different concerns

Weston was a village from 1881 and a town before it joined York, and its Victorian houses east of the rail corridor still define it. Part of it has been the Weston Phase 1 Heritage Conservation District since 2006. Ontario's heritage law leaves building interiors out of district permits, so a new kitchen normally needs only a building permit, where one applies. A new porch, different window openings or an addition that changes what the street sees normally goes to Heritage Planning first. Behind the brick, some of Weston's turn-of-the-century houses are wood frames on stone foundations, and repointing that stone is a mason's job, not ours.

Baby Point sits on a promontory above the Humber where Teiaiagon, a seventeenth-century Haudenosaunee village, once stood. Robert Home Smith began the subdivision in 1912, and most of its English Cottage and Colonial Revival houses went up in the 1920s and 1930s. City Council adopted the Teiaiagon-Baby Point Heritage Conservation District plan in December 2024, and on these streets the archaeology rules matter as much as the rules on facades. Home Smith also developed The Kingsway across the river, which our Etobicoke page covers.

Humewood, Cedarvale and Oakwood Village

York's eastern edge holds some of its larger houses. Humewood's houses date mostly from the 1920s and many of Cedarvale's from the 1940s, close to the Cedarvale Ravine, while Oakwood Village, with its shops on Oakwood Avenue and Vaughan Road, grew as a streetcar suburb. Typical plans here include a second-floor ensuite, a kitchen that opens to the back garden and a lower level for teenagers or a parent. These brick houses raise many of the same questions as their neighbours in the old City of Toronto, though the zoning paperwork can differ, as the questions below explain.

Whatever the street, the first step is a visit, then a written estimate that separates our carpentry and finishing from the plumber's, electrician's and engineer's share.

Local Know-How in York

Interwar houses, as found

Sagging joists, notched beams and wiring extended room by room are common finds in York's older houses, so the plan follows the house rather than a template.

Water before finishes

Grading, downspouts and the plumber's backflow protection are settled before a basement in Mount Dennis, Silverthorn or Rockcliffe-Smythe gets its walls.

Heritage and archaeology first

In Weston and Baby Point we confirm which parts of the job need Heritage Planning before a start date is set.

Storefronts on Eglinton and Weston Road

Partitions, ceilings, flooring and paint for shops and offices, scheduled around the businesses next door and the tenants upstairs.

Areas We Cover in and Around York

  • Weston
  • Mount Dennis
  • Oakwood Village
  • Fairbank
  • Silverthorn
  • Humewood-Cedarvale
  • Baby Point
  • Rockcliffe-Smythe
  • Keelesdale
  • Briar Hill-Belgravia
Services in York

Renovation Services for York Properties

York Home Renovations for Interwar Detached Houses and Semis

Main-floor work in York often starts at the back of the house. In Mount Dennis and Silverthorn, some houses began as small cottages that owners enlarged in stages, so a rear kitchen or enclosed porch can sit on lighter footings than the original walls and a step lower than the rooms in front. Folding that space into a bigger kitchen or family room can mean rebuilding its floor, walls and insulation first. At the front, small vestibules and closed-in stairs are common, and opening them becomes a question for the engineer when the stair wall carries the floor above. Our crew does the tear-out, carpentry, drywall, floors, trim and painting, and lines up the licensed electrician and plumber so their rough-ins pass inspection before the walls close.

Read more about general renovations

Basement Finishing Under York's Low Interwar Ceilings

Basements dug in the 1910s and 1920s were meant for storage and a furnace, and many in Silverthorn, Fairbank and Mount Dennis are too low for comfortable rooms, let alone a separate unit. Gaining height means lowering the floor, either with bench footings or full underpinning. An engineer designs it, an underpinning contractor does the excavation and concrete, and the City has to issue a permit first. Once the new slab has cured, we frame and insulate the walls, run drywall and ceilings around the ducts, and lay flooring suited to concrete. Finishing usually takes four to eight weeks after the structural work, and we price it separately so you can compare a lowered basement with one left at its present height.

Read more about basement finishing

Water Damage Repair After Flooded York Basements

Rockcliffe-Smythe owners whose basements take on storm water have a local program worth knowing about. In the Rockcliffe Special Policy Area and the sewer catchment connected to it, the City offers a no-fault grant for storm flooding damage that insurance does not cover, and it asks for estimates, invoices and photographs. Our part starts after a restoration company has removed the water and dried the structure, and after a licensed plumber has dealt with whatever let it in. We photograph each room before the walls close and write a room-by-room scope, so the paperwork for the grant or your insurance adjuster matches the work. Contents, drying and mould remediation stay with the restoration firm; walls, floors, trim and paint are ours.

Read more about restoration & damage repair

York Kitchen Renovations for Small Rear Kitchens

Kitchens in York's interwar houses tend to be small rooms at the back, sometimes with the basement stair and a side door cutting into the only long wall. Rearranging them usually means deciding which of those stays put. Floors in these rooms have often been built up with layers of old vinyl and plywood, so we strip them back to see how level the subfloor really is before cabinets are ordered. Walls are rarely square, and cabinets and countertops are scribed to fit them. On a Weston heritage street, a new range-hood vent on a wall the street can see may need the City's review, so we ask Heritage Planning before the brick is cored.

Read more about kitchen renovations

Bathroom Renovations in York's Storey-and-a-Half Homes

Many storey-and-a-half houses in Fairbank and Silverthorn put the only full bathroom upstairs under the roof slope, where the knee wall decides how far a tub can sit and a standing shower needs careful placement. We work out headroom before anyone chooses fixtures, and where a dormer would help, it becomes a structural and permit question for a designer and an engineer. Older houses here may still have cast-iron or galvanized lines; replacing them is the plumber's job and easiest while the floor is open. We frame and board the shower walls, install the membrane behind the tile, set the tile and finish the room. Most of these upstairs bathrooms take two to four weeks.

Read more about bathroom renovations

Insulation for York's Brick Walls and Half-Storey Attics

Upstairs in York's storey-and-a-half houses, sloped ceilings and knee walls box in the rooms, and the cavities behind them were often insulated lightly or not at all, so bedrooms up there run cold in January and hot in July. When the old ceiling comes down, we fit insulation into the slopes behind vent baffles so the roof deck can still dry, then insulate the knee walls and air-seal the attic floor behind them. Exterior walls take more thought. Some York houses have two layers of solid brick, others a wood frame with a single brick skin, and lining solid masonry on the room side keeps the brick colder and damper through the winter, when freeze-thaw can start to flake its faces, so we weigh that risk with you first.

Read more about insulation

Retail Fit-Outs Along Eglinton Avenue West in York

Construction of Line 5 Eglinton began in 2011, and for years the Little Jamaica storefronts on Eglinton Avenue West traded behind hoarding while many businesses between Marlee Avenue and Keele Street closed. With the line running since February 2026, owners and new tenants are fitting out units again. We build partitions and bulkheads, hang and finish drywall and ceilings, lay flooring and paint, and schedule around the electrician, plumber, HVAC contractor and sign installer. A restaurant or food shop also has health requirements to meet and may need a building permit for a change of use, which we help coordinate. Many of these buildings have apartments upstairs, so noisy work is planned with those tenants in mind.

Read more about commercial renovations

Also Available in York

Recent Projects Near York

View All Projects
Local Questions

Renovating in York: Your Questions Answered

Usually yes, but plan for an extra step. The Teiaiagon-Baby Point district plan calls for an archaeological assessment before work that disturbs the soil on those lots, including deck footings, below-grade additions and foundation repairs. Its scope is agreed with Heritage Planning ahead of the heritage permit application, with First Nations engagement along the way. Work confined to the interior, such as a new kitchen, normally does not trigger it. We build the assessment into the schedule instead of discovering it after the permit is filed.

It depends on the work. Renovating inside the existing walls generally does not involve TRCA, but an addition, a new structure or regrading on a property within its regulated area normally needs a TRCA permit, and the City will not issue the building permit for that work until TRCA has given its permit or clearance. TRCA's online mapping shows whether your lot is regulated, and we suggest checking it before any design work begins.

Toronto Building issues building permits across all the former municipalities, York included, so applications go to the City of Toronto. Zoning is less tidy. Most properties fall under the city-wide zoning by-law, but on some lots here parts of York's old by-law 1-83 still apply. A preliminary zoning review from the City settles which rules govern your lot before drawings are finalized, and we can help you gather what it asks for.

Usually, though stone calls for a different approach from poured concrete. Rubble stone laid in lime mortar lets moisture pass through it, so a mason repoints loose joints first, and if water actually runs in, a waterproofing contractor deals with that before anything is built. We then frame the walls slightly away from the stone and insulate with materials that tolerate damp, rather than sealing plastic against the masonry, and keep a way to see the foundation, such as an access panel, where it is worth watching.

Serving All of York

Ready When You Are

Let’s Bring Your Renovation Plans to Life

Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.

Call Now Free Estimate