Insulation
Keep your property comfortable and energy-efficient with properly installed wall, basement and ceiling insulation and vapour barriers.
Turn an unfinished or dated basement into a warm, dry and comfortable living space — from framing and insulation to the final finishes.
Of all the spaces in a house, the basement is where the building sets the most rules. The concrete is cold and can carry moisture, the ceiling is crossed by ducts and beams, and the furnace, water heater, electrical panel and drain stack all have to stay reachable. A good basement plan starts from those constraints and lays the rooms out to fit them, instead of drawing a wish list and forcing the house to follow.
Before anything is framed, we look for signs that water is getting in: white mineral deposits on the concrete, stains along the bottom of the walls, damp patches after heavy rain, or a musty smell. Many of these trace back to causes outside, such as downspouts emptying against the foundation or soil sloping toward the house, and those are often straightforward to correct. Active leaks and cracks that let water through are work for a foundation waterproofing specialist, and we will not build over them; finishing a wet basement only hides the problem until the drywall fails.
Our crew handles the framing, insulation and vapour barrier, drywall, ceilings, flooring, doors, trim and paint. Walls stand slightly off the foundation, on a bottom plate that is pressure-treated or sits on a moisture break. Below grade, the Ontario Building Code calls for moisture protection against the concrete and a vapour barrier on the warm side of the insulation, and we build the wall to match. Plumbing for a new bathroom, electrical for outlets and pot lights, and any changes to the ductwork are done by licensed trades, and their work is checked while the walls are still open.
Most basements take four to eight weeks, depending on size and scope. An open rec room with no bathroom sits near the short end. Separate bedrooms, a bathroom that needs the slab opened for drains, a wet bar and a ceiling full of bulkheads all push it longer, as do permit inspections. The same factors shape the cost, along with the ceiling type, the flooring you choose and any moisture problem that must be fixed before finishing begins.
A second unit is a different project from a rec room. It needs a building permit and has to meet Ontario Building Code and fire code requirements such as fire separation between units, smoke and carbon monoxide alarms, safe exits and adequate ceiling height. Planning for it from the start, even if you only rent later, avoids tearing out finished work. We help you lay out the space with those requirements in mind and work to the drawings your designer prepares for the permit.
Come down the stairs with us and we will show you what the space can hold. Book a visit, and a free written estimate will follow.
Keep your property comfortable and energy-efficient with properly installed wall, basement and ceiling insulation and vapour barriers.
Kitchens designed around the way you cook and gather — new layouts, cabinetry installation, tile backsplashes and flooring.
Modern, durable bathrooms with proper waterproofing, precise tile work and quality fixtures — from powder rooms to full ensuites.
Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.